Warehouse Solar in Melbourne: Planning a System for Industrial Roofs
Short answer: warehouses often suit solar because they have large roofs and, in many cases, steady daytime electricity use. The success of a project depends on the roof’s structural capacity, how well generation matches the site’s load, the lease or ownership arrangement, and network connection requirements. Since 1 October 2026, eligible systems up to 1 MW can also access STCs.
Start with your load profile
Interval data from your retailer or distributor shows how much electricity the site uses each half hour. Operations such as cold storage, packaging lines, compressors and lighting often run through the day, which aligns well with solar. Sites that mostly operate at night will export more and benefit less unless they add storage.
Check the roof
- Structure: older industrial roofs may need an engineer’s assessment of load capacity.
- Condition: if the roof sheeting is near the end of its life, consider replacing it first.
- Skylights and plant: these reduce usable area and can cause shading.
- Safety: edge protection, access and maintenance walkways need to be planned.
Lease and ownership
If you lease the building, the landlord’s consent is needed, and the lease term should be long enough to justify the investment. Some owners and tenants agree on arrangements where the owner installs solar and the tenant buys the electricity, but these need proper legal and commercial advice.
Network connection
Larger systems require distributor approval and may face export limits. Some sites are approved for zero or limited export, which makes on-site consumption even more important. Allow time for applications and any protection equipment the network requires.
Incentives at warehouse scale
Systems of 100 kW or less have long been eligible for STCs. From 1 October 2026, eligible systems above 100 kW and up to 1 MW can also create STCs as mid-scale systems. We explain this in our article on the commercial solar rebate expansion.
Should a warehouse add a battery?
A commercial battery can shift solar into evening operations or reduce peak demand, depending on your tariff. It is worth modelling once you understand your load and tariff structure. Our battery installation service covers commercial sites.
Project checklist
- 12 months of interval data
- Roof structural report and site plan
- Lease terms and landlord consent
- Current tariff and any demand charges
- Planned changes to operations or equipment
Frequently asked questions
Will installation disrupt operations?
Most work happens on the roof, with shorter shutdowns for connection. Timing can be planned around your operations.
Do I need planning approval?
Many rooftop systems do not, but heritage, overlays or ground-mounted arrays can change that. Check with your council.
Talk to us about your site
Cosmic Solar delivers commercial solar for Melbourne businesses. Contact us to arrange a site assessment.